Mill City Museum/Stone Arch Offices, Minneapolis, MN

  • Owner: Minnesota Historical Society/Brighton Development
  •   St. Paul/Minneapolis, Minnesota
  • Architect: Meyer, Scherer and Rockcastle
  • Project Size: 134,400 GSF $36,400,000

Description:

Project work included demolition of existing structural steel and concrete slabs. The new construction includes a new roof, floor, and partitions. A standalone mechanical system was installed with electrical and sprinkler systems which are tied into existing systems in the main museum area. The final product is a theater to be used by the Mill City Museum.

CPMI worked for both the Minnesota Historical Society and Brighton Development. We provided full-time on-site Owner’s Representative services. Responsibilities included financial reporting, quality control reviews, change order negotiation and attending meetings.